Calving Sheds Concrete Pour

Calving Shed Concrete Pour
This week we are ready to pour concrete outside the front of some recently completed Calving Sheds.


This week we are ready to pour concrete outside the front of some recently completed Calving Sheds.


BHC are nearing completion of a 140′ x 96′ Cubicle Shed with a 50,000 gallon shuttered concrete slurry tank.
Our works included the supply, delivery and erection of the portal framed shed including concrete works and internal fit-out.


This saves approximately, on average, 1,391 tonnes of CO2e emissions from being emitted into the atmosphere each year.
Since 2016, 4.3 million kWh of surplus Wind Electricity has been exported back to the National Grid, in total preventing an estimated 1,364 tonnes of CO2e from being emitted into the atmosphere, and assisting in meeting local, national and global climate change targets.
BHC has plans to become 100% energy self-sufficient with the addition of further sustainability measure such as an Anaerobic Digestion Plant. It is estimated that the AD Plant will produce an additional 4.4 million kWh of carbon-free electricity per annum.
Along with our Wind Turbine, we will produce 5.8 million kWh of ‘Green Electricity’ per annum, almost double our forecasted requirement.
With our current renewables (BHC B), BHC can offer a tonne of steel with 49% less associated carbon emissions compared to our carbon emissions prior to the installation of renewables (BHC A).
With the installation of an additional Wind Turbine, BHC can offer a tonne of steel with 61% less associated carbon emissions (BHC Option1).
Additionally, with the installation of an Anaerobic Digestion Plant, BHC can offer a tonne of steel with 70% less associated carbon emissions (BHC Option 2).

BHC are minimising our impact on the environment and meeting climate change targets in line with the 2015 Paris Agreement and UK Government Climate Change Act 2008, which both stipulate achieving a net-zero carbon target by 2050.

It’s always great to watch a project progress and see the results of our team’s hard work!
This project has come a long way since Summer when we started laying the foundations for the Slatted Shed with 190ft x 75ft x 10ft deep Underground Slurry Tank.


Earlier this year we completed a replacement 60′ x 60′ Lean-to Portal Frame building for a local client.


Our team recently completed a 40m x 30m portal framed Salt Storage Shed for a client in Bonnyrigg.
Not only did our works include structural steelwork and cladding, but we were also responsible for foundations, precast panels and laying the concrete floor.


We recently completed a 24m x 9m Cattle Shed with a 1.37m canopy down one side of the building above the feed barrier.


Throwback to 2017 when we completed a new Calf Shed for a client in Sanquhar. BHC was responsible for constructing a 100’ x 75’ portal frame, concrete works and the internal fit-out including a Bull Section, Group Calving Section and Individual Calving Pens.


Our team have recently completed a 60′ x 60′ Potato Cold Store for a client in Glenrothes.


BHC are nearing completion of an Equestrian Building for a charity that rescues ponies. The new building provides a safe space for families with disadvantaged children and young people to engage with ponies.

Your business is important to us. No matter the scale of your agricultural project, BHC’s size and expertise enables you to have the confidence in our ability and efficiency to deliver your project on time and within budget to a standard that meets your total satisfaction.
BHC Structural Steelwork
Medwyn Park
Edinburgh Road
Carnwath
South Lanarkshire
ML11 8HS
Tel: 01555 840006
Email: enquiries@bhc.ltd.uk
Mon – Fri: 8 am to 5 pm